Existing customers purchasing on account must contact [email protected] for their contract pricing.
No Image
Available
***LIMITED STOCK*** FLEXTIME IMPACT-XLARGE
Image may not reflect selected features
/vendors/4886/large/005-Flextime_01_01.jpg
additional image
***LIMITED STOCK*** FLEXTIME IMPACT-XLARGE (005TPR-X) by Watson Gloves
Heavyweight Durafibre microfibre palm with recycled grade D3O® Zero foam padded palm patches, WasteNot spandex back made from 96% recycled post consumer PET bottles, conductive fingertips and thumb can be used on all touchscreen devices, heavy duty rubber, snug-fitting neoprene wrist with secure Velcro® closure. Size XS–XXL. Two - 500mL recycled plastic bottle is used to make one pair of glo
Downloads
Product Specification
Item #
005TPR-X
Dimensions
Height: 1.00"
Width: 4.00"
Additional product details
Vendor Item #
005TPR-X
Industrial Category
Safety
Industrial Subcategory
Gloves and Hand Protection
Industrial Subtype
Synthetic Gloves
Applications
Automotive, Construction, Equestrian, Gardening & Landscaping, General Pur
Back Material
Spandex with TPR
Brand
Work Armour
Case Height
13.3
Case Length
25.5
Case QTY
72
Case UOM
BOX
Case Weight
42.9
Case Width
13.3
Closure Type
Velcro
Colour
Black/Tan
Country of Origin
China
HS Number
4203.29.3010
Inner Height
6
Inner Length
9
Inner QTY
6
Inner UOM
PACK
Inner Weight
2.7
Inner Width
4
Item Height inches
1
Item Length inches
9
Item Quantity
1
Item Weight lbs
0.45
Item Width inches
4
Order Unit Of Measure
PAIR
Palm Material
Goatskin
Size
X
Thumb Type
Wing
UNSPSC Number
46181504
Manufactured By
Watson Gloves


Other Details:
  • Dryhide water resistant full-grain goatskin leather palm
  • Heavy duty rubber on back of hand, fingers and knucle bar
  • Hooded fingertips and thumb
  • Snug-fitting elastic wrist
  • Spandex stretch back
Size
Additional options that would change other selections
GTIN
Additional options that would change other selections
Closure Type
Additional options that would change other selections
Call for Price
Qty:
BASE PRICE:
$
0
00
/ / 1
($0.00 / 1)
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
  • Manufacturer availability unknown.
To: From: Subject:

© 2025 TT Liquid, 680 Tradewind Drive Unit 4, Ancaster, ON L9G 4V5 Phone: (905) 529-3861

Website Development by XOLOGIC