Industrial Category
Safety
Industrial Subcategory
Gloves and Hand Protection
Industrial Subtype
Synthetic Gloves
Applications
Automotive, Construction, Equestrian, Gardening & Landscaping, General Purpose
Back Material
Spandex with TPR
Package Height inches
13.4
Package Length inches
25.6
Package Width inches
13.4
Product Series
Work Armour
Short Description
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity Spandex stretch back is flexible and provides form-fitting memoryLeather hooded fingertips and reinforced thumb.
Spec Sheet
https://www.watsongloves.com/wp-content/uploads/2019/07/005TPR-Flextime_Spec-Sheet_NP.pdf
Manufactured By
Watson Gloves
Other Details:
- Dryhide™ water resistant full-grain goatskin leather palm
- Heavy duty rubber on back of hand, fingers and knucle bar
- Hooded fingertips and thumb
- Snug-fitting elastic wrist
- Spandex stretch back